Objective

The objective of this Assignment is to provide solution for new data center requirements, Installation and configuration of New Data Center & Migration for Existing Device. The project aims to create suitable and conditioned Data center and ICT / AV / Security systems in order effective management to support business activities and services

Our Product Solution

Electricity

  • MDP - DC
  • SDP-UPS
  • PP-CRAC
  • DB-UTILITY
  • PDU - SERVER 1
  • PDU - SERVER 2

Raised Floor

  • Fiber Reinforced Calcium Sulphate
  • Antistatic HPL Covering
  • 600 x 600 mm x 32 mm
  • 52,92 kN/m2
  • 24,26 kN

Fire Suppression

  • Utility Room
  • Server Room

CCTV

  • IP Dome Camera 4MP Indoor
  • NVR 8Ch

Precision Air Conditioner

  • Cooling System: Air Cooled System
  • Air Discharge : Down Flow Air Discharge
  • Cooling Capacity: 46.9 Kw
  • System: Parallel Redundancy

Rack & Contaiment

  • Rack 42U 600mm Wide x 1070mm Deep Enclosure with Sides Black
  • Rack PDU 16A
  • Rack PDU 32A

Environmental Monitoring Systems

  • Monitoring power
  • Temperature/Humidity Sensor
  • Water Leak 10 Feet
  • Alarm Beacon

UPS

  • Power Capacity: 60 KVA
  • Backup time: 15 Minutes Full load
  • System: Parallel Redundancy

Contaiment

  • Celling Panel Mounting Rail - 1800mm
  • Celling Panel Mounting Rail - 300mm
  • Celling Panel Mounting Rail - 100mm
  • Celling Panel - 1200mm
  • Celling Panel Lock
  • Aisle Containment Door - Sliding
  • Door Header - 42U
  • Door Lock

Make a Request

Ready to get started? Talk to a consultant and make your requests.

REQUEST FOR SERVICES

Ready to get started? Talk to a consultant and make your requests.

Make a Request

Ready to get started? Talk to a consultant and make your requests.

rfs-men
× How can we help you?